Revit Projects
Revit Jobs worked on and information regarding them - very much a partial list (mostly just projects I've touched).
TODO: Use Add-Ins#RevitBatchProcessor to list all Revit files and parse projects from that. [Thought I'd started it, but don't know where saved...]
TODO: add "Addenda" column (one job has "sections" with separate revision numbering, etc.)
When you upgrade a project do NOT leave the old model in the old working folder.
Job # | Job Number and Name | Revit Version | Drawing Date | Level Elevation Format Shown | O L D |
Δ | Comments/ Description | #
p g. |
R e n |
E n g |
Sht
#s |
Load Diag. | Gen Notes | Architect | Link |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
153.02 | County of HI-Alii Drive Bridge - Supplement 3 | 2017 | n/a | bridge rendering/presentation | - | - | MH | - | - | - | |||||
1525 | DOT - Omao Stream Bridge Rehabilitation | 2017 | n/a | bridge rendering/presentation | - | - | MH | - | - | - | |||||
1586.01 | West Maui Village, Kapalua-Maui - Additional Services | 2015 | 2016-05-17 | <none> | Y | pool; cmu/steel cols, cmu/conc walls, steel beams/deck, wood bm/roofdeck | 20 | N | BM | Clifford Planning & Architecture | RVT | ||||
1669 | HAWAII USA FCU | Rs4,2008 | I think production was ME10 and/or AutoCAD, but was just used for a test project. precast... | Sueda | |||||||||||
2423.07 | ACOE - Schofield Barrack - Health Clinic Parking Structure | 2013 | 2016-09-27 | <none> | Y | USCOE; parking structure; precast/tilt-up walls; CIP basement/retaining; DT, LB, etc. beams | 50 | N | BM | RVT | |||||
2635.04 | ACOE - E.J. King High School, CFAS Sasebo, Japan | 2013 | USCOE, Japan; 2018-11-09: last edit; 2019-08-26: export CAD | BM, JR, ... | |||||||||||
3051.04 | Lahaina Center - Outlets of Maui, Phase II Building B-7 | 2015 | 2017-08-14[1] | <none> | octagon "lighthouse" on corner; removing too many columns; (E)/N steel framing, wood trusses/beams/posts; not much (E) struct modeled | Y | |||||||||
3059.08 | Moanalua Hillside Apartments | 2016-08-18 | <none> | new towers, etc.; partial demo (e) bldg; Honolulu County EPLAN | 122 | N,Y | BM | S100 | S030 | ||||||
3109 | Special Olympics Hawaii | 2014 | 2017-05-24 | <none> | Y | lt ga walls, conc cols, steel/glulam beams, wood joists/trusses | 19 | N | RVT | ||||||
3163.01 | Kalihi Palama Health Center Renovation, Phase 2 | 2017 | 2018-01-17 | n/a | 11 | JM | AHL | RVT | |||||||
3324.01 | New Hope Christian Fellowship, Sand Island | renovation & new parking structure | Y | GA | Anbe, Aruga, & Ishizu | CAD | |||||||||
3365 | Kowa Waikiki Beachside Hotel | 2015 | 2017-07-29,2018-09-17 | -2.00', +0.00', +5.25', +16.92', etc. (+#.##') | complex renovation | 50 | Y | BM, AF | S101 | - | Clifford Planning & Architecture | RVT | |||
3380, .02 | Hoakalei Clubhouse | 2015 | TG, JR | PVA (Peter Vincent) | IFC | ||||||||||
3441 | American Savings Bank, Kapolei | 2016-11-18 | Y | CMU walls/cols, steel cols, glulam/TJI beams, mansard wood trusses | 17 | N | TG | mga | RVT >CAD | ||||||
3483 | HCDA - High Technology Development Corporation Office Facility, Lot C | 2017-07-25 | Y | ACP (augered cip piles), steel cols/beams/brace frames, metal deck; funky angled pipe cols | 21 | RVT | |||||||||
3501.01 | Maui Lani Vlg Ctr-Warehouses Lots 65-68 Redesign | 2015 | 2015-09-22 (06-22) | 2018-01-04?: had corrupt "Reinf Bar-Beam.rfa" (discovered when ED tried to copy details to 4189.02) | 15 | Sueda & Assoc. | CAD | ||||||||
3504 | DOE - Waianae Elementary School, Administration Building | 2016 | 2017-08-18 | <none> | Y | DOE; center gutter; ltga stud wall, steel posts, PSL beams, wood rafters (tapered tails) | 12 | N | G70 | A:RVT
M:CAD | |||||
3507 | Hale Kipa - Old Fort Weaver Road Service Center | 14 | TG | S001 | Next Design | RVT | |||||||||
3525 | Star of Honolulu - Office Building | 2019 | Option 1: metal deck on steel beams
Option 2: ply on TJI |
N | S201 | Ushijima | CAD | ||||||||
3529 | DOE - Waimanalo Elementary School - STEM Building | 2018 | DOE;
ED setup |
RVT | |||||||||||
3533.03 | ACOE - FY16 F-22 Fighter Alert Facility, JBPHH - Design (CLIN 1&2) | 2015 | 2017-07-28 | unclear/mixed (sloppy/errors?) | USCOE, Hawaii; multiple buildings, linked into one model for convenience; 2017-12?: Design Options (DOs) for flat vs. sloped roof - one chosen, but option maintained; ML | 21 | JM | INK | RVT | ||||||
3533.10 | ACOE-FY17 PN 807 Aircraft Maintenance Complex, Kadena AB, Japan | 2016 | 2017-08-08 | 150, 4750, etc. (MM) | USCOE, Japan | ||||||||||
3577 | Aloha Pacific Center, Kapolei | 2017 | 2017-04-27,03-28 | n/a (plans only so far) | using C4R; 3 buildings; DEAD (no funding) | JM | S1-001 S2-1 01 S3-1.01 |
SVA Arch. | RVT | ||||||
3610.10 | DOT Airports-HIA, Replace Overseas Terminal Roof, Phase I | 2017 | 2019-10-07 | 43 | Y | BM | S-101 S-104a S-104b | S-002 | RMA | RVT | |||||
3650 | Malakole Warehouse Development | 2015 | 2015-10-19 (2016-03-11) | <none> | - | tilt-up walls, steel cols/beams, OWJ, metal deck | 25 | N | Sueda & Assoc. | CAD | |||||
3652 | Longs CVS Drug Store, Nanakuli | 2019 | see also 4810.01 for a similar following project | CAD | |||||||||||
3678.03 | C&C of Honolulu - Honouliouli WWTP Phase 1B | using Vault; multiple buildings, multiple models | KH, BC, MC | S331 | R M Towill | RVT | |||||||||
3686 | DOE - Farrington HS-Ph II - New Gym & Locker Facility | RVT | |||||||||||||
3786 | Goodwill, Beretania | 2015 | ML; trying to upgrade to 2016: unrecoverable error; revisions | 35 | Y | TG? JY | Ushijima | CAD | |||||||
3795.10 | Sand Island WWTP Improvements - Maintenance Building | 2019 | BIM 360 | ||||||||||||
3795.40 | Sand Island Waster Water Treatment Plant Improvements - Headworks Retrofit | 2019 | BIM 360 | AECOM? | RVT | ||||||||||
3815.01 | 325 Seaside Avenue - TJ Maxx Core & Shell (IMAX) | 2015 | 2017-08-11 | 0', 5', 8.4', etc. (one decimal, suppress trailing zeros) | complex renovation | Y | BM, ... | ||||||||
3840.02 | ACOE-DoDEA, Replace Kinnick High School, CFA Yokosuka, Japan-DESIGN | 2017-08-01 | <none> | USCOE, Japan | 170 +6A | BM, ... | LD S-003 .. S-008 | ||||||||
3842 | Resurrection of The Lord Parish Center & Sanctuary Renovation | 2017-11-13 | n/a? | delta 1 | 18 | Y | JM | In+Form Design | RVT | ||||||
3910 | DOE - Campbell High School New Classroom Building | 2016 | 2017-11-20 | <none> | DOE; Precast beams/cols/tees, CMU walls, OWJ, steel beams | 79 | N | GA, RH, BM | S-004 5S-103 | LD S-003; PC S-004,5 | G70 | RVT | |||
3913 | A & B - Macy's, Kailua - Renovation | 2015 | 2017-09-19 | extensive renovations in 2017; as-builts from 1953 & 1960 extension; precast I-beams, CIP conc floor & cols, steel beams, cols, & deck; see 4591 for a tenant improvement in 2018 | 23 | Y | ? |
S-001
S-201B |
AHL | RVT | |||||
3916 | DOT Harbors - Kapalama Marine Terminal - PASHA Building | 2018 | 2018-03-30 schematic design (SD) progress; (pre-2019-03-20: JT tried "Linked Details..." per AS122874 from AU2017 on "3916 KAI_DOT Kapalama_Administration Building.rvt", but they wound up splitting it out) | N | KH | S100 | Pacific Arch., Inc. | CAD | |||||||
3931 | DOE - Maui HS - Weight Training & Wrestling Building | 2018 | gen notes & typicals copied from 3412.01 | TG | CAD | ||||||||||
3939 | ACOE - Fort Shafter Dental Clinic, Building 339 | 2016 | 2017-04-24 | Y | USCOE; CMU, ltga, Unistrut; we were prime? | 15 | Y | BM | SF0.04
SB1.12 |
United EXCEL? | RVT | ||||
3962 | Lanikai Beach House - 974 Mokulua Drive | <none> | Y | cip conc basement / pool - walls, SOG, suspended slab, cols; PT waffle slab & custom steel plate-beam lattice roof at 45°; load diagrams; partial plans; stepped ftgs with elevations; aluminum canopies | N | GA | S100 | LD S003 | Shim-Sutcliffe | RVT | |||||
3979 | Panda Express, Wahiawa | 2015 | 2017-09-18 | <none> | renovation (was KFC, maybe mexican before that; no CMU parapet; no CMU fins) | Y | BM ,AF | Gary Wang & Assoc.[2] | CAD | ||||||
4004 | Bank of Hawaii, Pearlridge | 2016 | 2017-06-09(delta 4) | <none> | Y | conc retaining / CMU / ltga? walls, steel columns & beams, light gage roof truss - flat full span w/ jacks on top around edges (metal deck @ mech inside space), plywood roof sheathing | 17 | N | TG | PVA (Peter Vincent) | RVT/
CAD? | ||||
4017 | Hale Kuike | 2015 | 2017-08-04 | <none> | |||||||||||
4030 | DOE - Waipahu HS New Classroom Building, Phase 1 | 2019 | 2019-05-06 | <none> | 35 | N | GA
JY |
S-001 | WRNS Studio | RVT | |||||
4061 | Hapuna Beach Prince Hotel Renovation | 2016 | 2017-08-10..06-19 | n/a (not showing Levels) | renovation | 5, 8, 9, 5, 14, 9, 3, 4, 10, 5, 6 =78 | Y | GA | S-101-S1
S-111-P4 S-011-C1 |
G70 | RVT | ||||
4065.01 | BYUH - Technology Services Design | 2016 | 2017-08-08 | n/a (plans only so far) | renovation;
LJC setup; KS drafting details, ML plans |
Y | JM | RVT | |||||||
4094 | Wailepo Street Apartment | 2019-06-06 | <none> | 23 | N | TG | S201 | S002 LD | CPA | RVT | |||||
4103 | Ala Moana SC - Pandora (Space 2324) | 2016 | 2016-08-17 | <none> | Y | KS setup; tenant improvement - light guage storefront | 2 | Y | JM | In+Form | RVT | ||||
4111 | Kapolei Business Park, Phase 2 - Lot 22 | 2015 | tilt-up | Ushijima | CAD (old RVT?) | ||||||||||
4111.01 | Kapolei Business Park, Ph 2-Lot 20, Addl Svc Best Buy Revisions | 2015 | renovation of 4111 | Y | Ushijima | CAD | |||||||||
4153.03 | Sheraton, Waikiki-Guest Room Renovation | 2016 | was CAD markup over as-built drawing scans | Y | GA | Ben Woo | CAD | ||||||||
4159 | CBI King St-Building Renovation | 2017 | 2017-05-03 | <none> | 4 | Y | TG | S001 | WCIT Arch. | CAD | |||||
4189.02 | Maui Lani Warehouse - Lot 13 - 17 | 2015 | see also 3501.01; 2018-01-04?: ED (setup?) | CPA | RVT | ||||||||||
4189.03 | Maui Lani Warehouse - Lot 43A | 2015 | 2017-11: KS setup | FL TG | RVT | ||||||||||
4189.04 | Maui Lani Warehouse - Lot 53A | 2015 | 2017-11: KS setup | FL TG | 5S-005 | G70 | RVT | ||||||||
4200 | Whalers Village SC-Leilani's Restaurant | 2017 | 2017-07-06 | <none> | 13 | Y? | TG | S001 | WCIT Arch. | RVT | |||||
4223 | Iolani School, Phase 1 | 2016 | 2017-07-31 | <none> | Residence: PT [TODO: confirm]; multiple buildings | GA? | |||||||||
4226 | International Trucks of Hawaii - New Service Shop & Office | 2016 | 2017-08-24 | <none> | - | tilt-up walls, OWJ, lt ga purlins | 21 | N | TG | DRA | CAD | ||||
4244 | BYUH - Science Building | 18 | S-001 | AHL | RVT | ||||||||||
4263 | 2779 Waialae Apartment | 2017 | 2017-12-15 | <none> | general notes w/ subscripts; steel framing, metal deck, conc topping, conc bsmt rtg walls | 28 | GA | S001 | MGA | CAD | |||||
4270.01 | BYUH - Cafeteria Building (Design) | 2016 | 2017-10-18 | ARCH PU: 1/32"; Phase Maps; Shared (Project) Parameters | N | GA FL | S1.02 | HDR | RVT | ||||||
4293 | Island Orthopedics Renovation | 2017 | 2017-07-18 | <none> | renovation | 11 | Y | BM AF | S-001 | MGA | CAD | ||||
4315 | Kapiolani Medical Center - Kitchen & Dining Hall | 2018 | CAD | ||||||||||||
4344.02 | Kona Brew Pub - Design | 2018 | 2020-01-22 | <none> | BIM360, but worked locally | 15 | Y | BM AF | S-001 | RVT | AHL | RVT | |||
4363 | Our Lady of Perpetual Help Sanctuary Renovation\ | 2018 | |||||||||||||
4376 | Aqua Pearl Hotel, Waikiki | 2018 | 2019-07-30 | Two architects (interior designer Studio Mai using CAD); adding pool deck over mechanical parking-on-grade | Y | BM | S-2.01 | - | Ben Woo | RVT | |||||
4381.01 | ACOE - Schofield Barracks - Building 580 Fernandez Hall, Design | 2016 | JT (start), ML (e model), ED (new model & sheet setup) | Y | GA | RVT | |||||||||
4406 | Islander Group Warehouse | 2017 | tilt-up | 25 | FL | S001 | DRA | CAD | |||||||
4447 | Malama Market, Pahoa - Foodland | 2016 | 2018-03-15 | <none> | related to "4409 Puna Kai Shopping Center, Pahoa-Hawaii"? | 20 | TG JP | S001 | G70 | RVT | |||||
4448 | A&B - Kahala Avenue Residences | 2017 | CAD | ||||||||||||
4486 | BOH, Corporate Office Renovation | 2018 | TG | WCIT Arch. | RVT | ||||||||||
4501 | New Hope Central Oahu (Mililani) | 2016 | S001 | G70 | RVT | ||||||||||
4520 | DOE - Kapolei High School Classroom Building | N | BM | S1.01 | NAC Arch. (WA) | RVT | |||||||||
4520.01 | DOE - Kapolei High School Classroom Building (Part 2), Building G, I and J | 2018 | Y | BM | S1.01 | NAC Arch. (WA) | RVT | ||||||||
4529 | UHWO-Science, Tech, & Creative Mdia (DB) |
2018 |
2019-02-22,25 | 22 16, 17? | N | BM | S101 | - | Gensler
Next Kiewit |
RVT | |||||
4540 | Hawaii Pacific Health, Ka Makana Alii - Tenant Improvement | 2017 | Y | RVT | |||||||||||
4543.01 | Wilcox Medical Ctr-Emergency Generator Replacement (Option 1C) | 2019 | increased/wrapped concrete columns | Y | GA JY | S200? S01? | KYA | CAD | |||||||
4591 | A & B - Lau Hala Shops (Old Macy's, Kailua) - GOEN Dining + Bar - Tenant Improvement | 2018 | a tenant improvement of 3913; setup with ED | Y | TG | non-Adsk | |||||||||
4593.10 | IBEW [HEPF] Building - Phase 1 New Building & Exterior Renovation of Existing Building | 2018 | 2019-10-26 | Phase 1: new parking lot (& offices at top); Phase 2: modifications to existing building (S-x5x) | N,Y | BM | S-100 S-150 | LD S-010, S-011 | AHL | RVT | |||||
4646 | Mililani Town Center - Expansion | 2019 | JT setup; 2019-02-25 LJC: helped ED copy border from 4004; TODO: should cleanup logo - convert to text (JPG right now) - if they're going to be a regular client | TG JP | PVA (Peter Vincent) | CAD[3] | |||||||||
4664 | Queen's Medical Center, West Oahu | 2015 | ML setup; rotated project north; | RMA | RVT | ||||||||||
4667 | 3603 Diamond Head Road Remodel - New Makai Stairs | 2018 | 3"ø micropile | TG | RVT | ||||||||||
4706 | Dolgner Residence - Addition | 2019 | 2019-01-30 | <none> | copied 4263 border | 9 | Y | BM | S-101 | - | MGA | CAD | |||
4774 | HDC Properties-Campbell Industrial Park, Warehouse & Office Building | 2019 | 2019-08-26 | 40'-11" | Hanua Street Warehouse; tilt-up | 18 | N | TG | S201.1 | WU S202.3 | Sueda & Assoc. | CAD | |||
4782.01 | DAGS-Hawaii Veterans Home, Aiea-SD [HSVH] | 2018 | 2019-08-28 | 57 | BM | S-101 | - | MGA (ext) & OW (int) | RVT & Archicad | ||||||
4809 | Hanalei Colony Resort - Back of House & Rec. Facility | 2018 | 2019-10-11 | 27'-0 3/4" | "GROUND FLOOR" Level is at -0' 2 95/128"; tall 1st floor with breakaway walls for flooding | 17 | N | BM AF | S11 | - | Ben Woo | RVT | |||
4810.01 | Hoomaka Marketplace, Longs CVS Drug Store | 2020 | 2019-09-26 | +76.00' | very similar to 3652 Longs CVS Drug Store, Nanakuli | 21 | N | BM | S-101 | WU S-103 | CAD | ||||
4825 | White Sands Hotel - Phase 2, Pool Trellis | 2019 | 2019-03-18 | 11'-2" | bar structure / hut | 3 | Y/N | BM | S-1.01 | - | Workshop | SKP | |||
4867 | Chick-fil-A, Makiki | 2018 | BIM 360 | ||||||||||||
4897 | 1132 Bishop St, Douglas Emmett | 2018 | 2019-10-24 | <none> | JT setup; 2019-02-25 LJC: helped ML fix links, phase, level, & view range | 27 | Y | TG | S2.0P1 S2.01 | - | SCB | RVT | |||
4905.11 | KR2 Site, Kauai - Utility Building, CDs & Construction | 2019 | Shimokawa+Nakamura | ||||||||||||
4913 | Kapolei Mokulani Development - Lots 5, 6 and 9 - Mini of Hawaii | 2020 | 2019-10-22 | 17'-0" | elevations are terrible - not orthogonal or even distances; plan seems ok | 22 | N | BM | S100 | - | DKKY[4] | CAD | |||
5329 | Hokuala, Lihue-Kauai - Parcel 9 | 2020 | 3 buildings | Shimokawa+Nakamura | CAD |
Sheet numbering systems: S001, S-001, S1.01, 1S-001, S1-1.01 (probably not S1-1 01 or S1-101), S-111-P4, SB1.12
Typical Notes (TODO: move somewhere else)
[2018-09-25 3:01pm BM email to BZ re: 3610.10] Please mark up the drawings to indicate basic things, just once on each :
(E) CONCRETE COLUMN, TYP
(E) PRECAST CONCRETE TEE WITH __” CONCRETE TOPPING, TYP
(E) ___ PILES, TYP
(E) CONCRETE PILE CAPS, TYP
(E) CONCRETE GIRDER, TYP
(E) __” CONCRETE WALL
(E) STEEL BEAMS, TYP
(E) ___” METAL DECK WITH __” CONCRETE TOPPING
(E) ___” METAL DECK
(E) STEEL SPACE FRAME TRUSS, TYP
Notes
- ↑ P:\3051-3100\3051.04 Lahaina Center - Outlets of Maui, Phase II Building B-7\004 Drawings\Structural\Revit 2015\_Archive\2017-08-17 progress\2017-08-17_3051-04_KAI_Building_B Cabo Core and Shell_Permit_progress [no plot].pdf
- ↑ 2017-09-18 LJC: converted arch's logo from .jpg to text & lines (imported & cleaned up CAD), but don't have arch's HSB-2010.ctb (so line weights are just a guess); moved "Sheet Name" 1/8" down; moved "Sheet Name" & "Sheet Number" 3/32" left; edited Revision Schedule position, width, & text size to better match the line spacing
- ↑ DWG exports from 2D ArchiCAD
- ↑ Davie Young? - subs out CAD drafting